A conveyancing file starts with an address and a client's expectations. The official searches, the local authority search, drainage and water, environmental and, in coalfield areas, the coal mining search, take time to return and are the record the transaction relies on. Much of what they confirm can be screened at instruction.
That early screen is what conveyancing data is for: flagging the leasehold with a short lease, the conservation area, the property near a listed building or the address in a coal mining area before the client has committed to a timetable.
What can you check from property data on day one, and what still needs the official search?
What is conveyancing data?
Property-level data that answers the questions a conveyancer asks about a title and its location. The core sets:
| Data | What it tells you at instruction |
|---|---|
| Tenure and title numbers | Freehold or leasehold, and which HM Land Registry titles to order |
| Lease terms | Lease start, expiry and remaining term |
| Planning history | Applications on the property, with status and decision dates |
| Planning constraints | Conservation area, Article 4, nearby listed buildings, flood zones |
| Mining | Whether the location falls in a coal or other mining area |
| EPC | Current rating and fabric, relevant to buy-to-let and lending |
| Sale and listing history | Previous prices and what the property was marketed as |
Does property data replace conveyancing searches?
No. The official searches remain the record: the LLC1 and CON29 local authority search covers local land charges, planning permissions, building regulations and road schemes; the drainage and water search confirms connections to mains water and public sewers; the environmental search covers flood, contaminated land and ground stability. Property data is a screen that tells you, early, which questions those searches are likely to raise.
Screen the file on day one, and the searches confirm what you already expected.
What can conveyancers check at instruction?
Five checks that change the advice or the timetable:
- Lease length. A short remaining term affects mortgageability and may need an extension before exchange.
- Constraints. A conservation area or Article 4 direction limits what the buyer can do, which matters if they have plans.
- Planning history. Undecided or recent applications on the property or next door.
- Mining area. Whether the address sits in a coal or other mining area. This is an indicative screen that tells you a coal mining search is needed; it does not replace one.
- Material information. National Trading Standards guidance requires listings to show price, tenure and council tax (Part A), the property's type, construction, rooms, utilities and parking (Part B), and issues such as flood risk or restrictive covenants where they apply (Part C). Comparing the listing with the data catches gaps early.
Our planning data API guide explains how constraints are matched to a property, including the difference between a property inside a conservation area and a listed building nearby.
How do conveyancers get this data from Propalt?
By UPRN or address, through one API or MCP call. Propalt AI returns tenure and title numbers, lease start, expiry and remaining term, planning applications and constraints with how each was matched, coal and mining area checks, EPC rating and fabric where a certificate is lodged, broadband and sale history for addresses in England and Wales. Planning constraints cover England.
- In your case management system. Pull the screen into the file at instruction through the REST API.
- In Claude or ChatGPT. Ask "Is 12 Example Road in a conservation area, and how long is left on the lease?" through the Propalt MCP server.
- For the client. Use the results to set expectations on timetable and risk before the searches return.
See property data for conveyancers for the workflow, and pricing for the free plan, with 500 credits a month and no card, and credit-based, month-to-month paid plans.
Sign up free at propalt.ai, get 500 credits a month with no card, and run your next instruction's address through the screen.
📌 KEY TAKEAWAY
Conveyancing data lets a conveyancer screen tenure, title numbers, lease length, planning history and constraints, mining areas and EPC at instruction, so the official searches confirm what the file already flagged. It does not replace the local authority, drainage, environmental or coal mining searches. propalt.ai returns that screen for any England and Wales address through one API or MCP call.
SOURCES & DATA REFERENCES
- Enact Conveyancing (27 April 2026). 'Understanding conveyancing searches: why they matter when buying a property.' Local authority (LLC1 and CON29), drainage and water, environmental, coal mining searches. https://www.enact.co.uk/2026/04/understanding-conveyancing-searches-why-they-matter-when-buying-a-property/
- National Trading Standards (February 2022, updated July 2022). 'Material information for property listings announced.' Part A; Consumer Protection from Unfair Trading Regulations 2008. https://www.nationaltradingstandards.uk/news/material-information-for-property-listings-announced
- RICS (30 November 2023). 'Material information: what to know and what happens next.' Parts B and C. https://www.rics.org/news-insights/material-information-what-to-know-and-what-happens-next
- Propalt (November 2026). Property, leasehold, planning, constraints, coal and mining, EPC and broadband endpoints. Propalt API / MCP.



